Free Autocad Washer Connector Box Detail Drawings
CONTACTS
Standard Drawings & Details, STD-342-400
NOTE: To open DWG. files, you need the AutoCad Program. You can also view the CAD drawings using Voloview. Netscape users-right click on AutoCad icon and select "Save Target As" to save to your computer and then open. The PDF files open with Adobe Acrobat.
Fire Protection | Civil | Architectural | Structural | Mechanical | Electrical | Instrumentation & Control |
Fire Protection (Chapter 2)
POC: Todd Smith, ES-EPD, 665-3152 Alt: Scott McMurtrey, ES-EPD Suggestions (LANL ONLY; use IE)
Drawing Number | Sheet | Rev. | CAD | Title | Date | |
---|---|---|---|---|---|---|
ST-D4010-1 | 1 | 2 | Sprinkler System Riser Detail -Wet Pipe [temporarily withdrawn; contact POC for latest draft] | 9/8/04 | ||
ST-D4010-1 | 2 | 2 | Sprinkler System Riser Detail - Wet Pipe (Transportable) [temporarily withdrawn; contact POC for latest draft] | 9/8/04 | ||
ST-D4010-1 | 3 | 2 | Sprinkler System Riser Detail - Pre-Action [temporarily withdrawn; contact POC for latest draft] | 9/8/04 | ||
ST-D4010-1 | 4 | 2 | Sprinkler System Riser Detail - Dry Pipe [temporarily withdrawn; contact POC for latest draft] | 9/8/04 | ||
ST-D4010-1 | 5 | 2 | Sprinkler System Riser Detail - Deluge [temporarily withdrawn; contact POC for latest draft] | 9/8/04 | ||
ST-D4010-1 | 6 | 2 | Sprinkler System Riser Detail - Backflow Preventer/Design Notes [temporarily withdrawn; contact POC for latest draft] | 9/8/04 | ||
Top of page |
Civil (Chapter 3)
POC: Jon Stein, ES-UI, 695-8932 List of Complete Alternates Suggestions (LANL ONLY; use IE)
Drawing Number | Sheet | Rev. | CAD | Title | Date | |
---|---|---|---|---|---|---|
ROADWAYS | ||||||
ST-G2010-1 | 1 | 4 | Typical Road Sections | 08/4/16 | ||
ST-G2010-1 | 2 | 2 | Typical Parking Lot Sections | 08/4/16 | ||
ST-G2010-2 | 1 | 3 | Curb & Gutter | 08/4/16 | ||
PARKING LOTS | ||||||
ST-G2020-1 | 1 | 4 | Parking Layout | 08/4/16 | ||
ST-G2020-1 | 2 | 4 | Parking Layout (Accessible and Motorcycle) | 12/08/20 | ||
PEDESTRIAN & BICYCLE FACILITIES | ||||||
ST-G2030-1 | 1 | 4 | Sidewalk | 08/4/16 | ||
SITE DEVELOPMENT | ||||||
ST-G2040-1 | 1 | 7 | Security Fence / Typical Fence | 01/19/22 | ||
ST-G2040-1 | 2 | 4 | Security Fence / Pedestrian Gate | 08/18/16 | ||
ST-G2040-1 | 3 | 4 | Security Fence / Vehicle Gate | 08/18/16 | ||
ST-G2040-1 | 4 | 4 | Security Fence / Gate Latching | 08/18/16 | ||
ST-G2040-1 | 5 | 4 | Security Fence / Hill Side Fence | 08/18/16 | ||
ST-G2040-1 | 6 | 4 | Security Fence / Embankment Fence | 08/18/16 | ||
ST-G2040-1 | 7 | 4 | Security Fence / Top of Embankment | 08/18/16 | ||
ST-G2040-1 | 8 | 4 | Security Fence / Bottom of Embankment | 08/18/16 | ||
ST-G2040-1 | 9 | 4 | Security Fence / Fence Manproofing | 08/18/16 | ||
ST-G2040-2 | 1 | 3 | Fence - Smooth 3-strand Typical Details | 08/18/16 | ||
ST-G2040-2 | 2 | 3 | Fence- Smooth Strand Single or Double Gate | 08/18/16 | ||
LOW IMPACT DEVELOPMENT | ||||||
ST-G20GEN-1 | 1 | 0 | General Design Requirements | 02/10/20 | ||
ST-G20GEN-1 | 2 | 0 | Specific Design Requirements | 02/10/20 | ||
ST-G20GEN-1 | 3 | 0 | Specifications Standards | 02/10/20 | ||
ST-G20GEN-1 | 4 | 0 | Vegetated Swale | 02/10/20 | ||
ST-G20GEN-1 | 5 | 0 | Storm Water Channel | 02/10/20 | ||
ST-G20GEN-1 | 6 | 0 | One-Rock Check Dam | 02/10/20 | ||
ST-G20GEN-1 | 7 | 0 | Check Dam + V-Weir | 02/10/20 | ||
ST-G20GEN-1 | 8 | 0 | Zuni Bowl | 02/10/20 | ||
ST-G20GEN-1 | 9 | 0 | Sloped Dissipater | 02/10/20 | ||
ST-G20GEN-1 | 10 | 0 | Flowline Externder | 02/10/20 | ||
ST-G20GEN-1 | 11 | 0 | Level Spreader | 02/10/20 | ||
ST-G20GEN-1 | 12 | 0 | Filter Media | 02/10/20 | ||
ST-G20GEN-1 | 13 | 0 | Permeable Paving | 02/10/20 | ||
ST-G20GEN-1 | 14 | 0 | Bio-Retention Cell /Oxbow | 02/10/20 | ||
ST-G20GEN-1 | 15 | 0 | Control Basin | 02/10/20 | ||
ST-G20GEN-1 | 16 | 0 | Cistern | 02/10/20 | ||
UTILITIES | ||||||
ST-G30GEN-1 | 1 | 5 | Bollard [currently use is optional and not for use as a vehicle barrier] | 08/4/16 | ||
ST-G30GEN-2 | 1 | 3 | Thrust Blocks | 08/4/16 | ||
ST-G30GEN-3 | 1 | 3 | Tracer Wire | 08/4/16 | ||
ST-G30GEN-4 | 1 | 4 | Single Trench | 08/4/16 | ||
ST-G30GEN-4 | 2 | 4 | Earthwork Utilities Tables | 08/4/16 | ||
POTABLE/FIRE PROTECTION WATER | ||||||
ST-G3010-1 | 1 | 3 | Valve Box Detail -Gas/Water | 09/01/16 | ||
ST-G3010-2 | 1 | 5 | Water Piping Tie-In, 3/4" - 2" Copper Service Line | 07/21/20 | ||
ST-G3010-2 | 2 | 5 | Water Piping Tie-In, 4" - 12" Service Line | 07/21/20 | ||
ST-G3010-3 | 1 | 3 | Water Piping Shut-Off Valve, 4" - 12" Line Size | 09/01/16 | ||
ST-G3010-3 | 2 | 3 | Water Piping Shut-Off Valve, for Fire Line (PIV) | 09/01/16 | ||
ST-G3010-4 | 1 | 4 | Fire Hydrant, Gate Shut-Off Valve | 09/01/16 | ||
ST-G3010-5 | 1 | 4 | Sloping Pipe Anchor | 09/01/16 | ||
ST-G3010-6 | 1 | 3 | Water Valve Support | 09/01/16 | ||
ST-G3010-7 | 1 | 0 | Air Relief Valve (ARV) | 05/05/21 | ||
SANITARY SEWER | ||||||
ST-G3020-1 | 1 | 3 | Santitary Sewer Manhole | 09/01/16 | ||
ST-G3020-2 | 1 | 6 | Exterior Sewer Lift Station | 09/01/16 | ||
ST-G3020-2 | 2 | 6 | Exterior Sewer Lift Station Plan | 09/01/16 | ||
ST-G3020-2 | 3 | 6 | Lift Station Concrete Wet/Dry Well | 09/01/16 | ||
ST-G3020-2 | 4 | 6 | Lift Station Electrical Detail | 09/01/16 | ||
STORM WATER | ||||||
ST-G3030-1 | 1 | 2 | Concrete Catch Basin | 09/15/16 | ||
ST-G3030-2 | 1 | 2 | Precast Concrete Catch Basin | 09/15/16 | ||
ST-G3030-3 | 1 | 3 | Man Hole | 09/15/16 | ||
STEAM/CONDENSATE | ||||||
ST-G3040-1 | 1 | 4 | Tie-In | 09/15/16 | ||
ST-G3040-2 | 1 | 3 | Site Steam Drip Leg | 09/15/16 | ||
NATURAL GAS | ||||||
ST-G3060-1 | 1 | 2 | Gas Piping Tie-In, Steel Service Line to Steel Main | 09/15/16 | ||
ST-G3060-1 | 2 | 2 | Gas Piping Tie-In, PE Service Line to Steel Main | 09/15/16 | ||
ST-G3060-1 | 3 | 2 | Gas Piping Tie-In, PE Service Line to PE Main | 09/15/16 | ||
ST-G3060-2 | 1 | 3 | Gas Regulator, Two Stage, Low Flow | 09/15/16 | ||
ST-G3060-2 | 2 | 3 | Gas Regulator, Two Stage, High Flow | 09/15/16 | ||
ST-G3060-2 | 3 | 3 | Gas Regulator, Single Stage, Low Flow | 09/15/16 | ||
ST-G3060-2 | 4 | 3 | Gas Regulator, Single Stage, High Flow | 09/15/16 | ||
Top of page |
Architectural (Chapter 4)
POC: Scott Richardson, ES-EPD, 606-0596 Alt: TBD Suggestions (LANL ONLY; use IE)
Drawing Number | Sheet | Rev. | CAD | Title | Date | |
---|---|---|---|---|---|---|
EXAMPLE DRAWINGS | ||||||
A-1000 | - | 1 | Floor Plan of Record | 06/27/16 | ||
A-1001 | - | 1 | Floor Plan of Record | 06/27/16 | ||
A-1010 | - | 1 | Roof Plan of Record | 06/27/16 | ||
A-1011 | - | 1 | Roof Plan of Record | 06/27/16 | ||
STANDARD DETAILS-G2040 EXTERIOR WAYFINDING | ||||||
ST-G2040-4 | 1 | 3 | Tech area Identification Sign and Detail | 08/16/18 | ||
ST-G2040-4 | 2 | 3 | Facility Complex Identification Sign and Detail | 08/16/18 | ||
ST-G2040-4 | 3 | 3 | Division Identification Sign and Detail | 08/16/18 | ||
ST-G2040-4 | 4 | 3 | Pedestrian Directional Sign A | 08/16/18 | ||
ST-G2040-4 | 5 | 3 | Pedestrian Directional Sign B | 08/16/18 | ||
ST-G2040-4 | 6 | 3 | Freestanding Building Identification Sign and Detail | 08/16/18 | ||
ST-G2040-4 | 7 | 3 | On-Building Identification Letters and Detail | 08/16/18 | ||
ST-G2040-4 | 8 | 3 | Building Identification Plaques and Detail | 08/16/18 | ||
ST-G2040-4 | 9 | 3 | Sign Base Detail and Alternate | 08/06/18 | ||
Top of page |
Structural (Chapter 5)
POC: Michael Denlinger, ES-EPD, 667-6572 Suggestions (LANL ONLY; use IE)
Drawing Number | Sheet | Rev. | CAD | Title | Date | |
---|---|---|---|---|---|---|
FOUNDATION SUPPORT SYSTEM FOR TEMPORARY TRAILERS | ||||||
ST-Z1052-1 | 1 | 2 | Single Wide Trailer Requirements for In-Situ Soil | 05/17/18 | ||
ST-Z1052-2 | 1 | 2 | Foundation Support System for Temporary Trailers-double wide | 06/28/18 | ||
ST-Z1052-3 | 1 | 0 | Tie-down quantities Considering Topographic Factor | 05/17/18 | ||
ST-Z1052-4 | 1 | 0 | Tie-down quantities Considering Topographic Factor | 06/28/18 | ||
METAL STAIRS | ||||||
ST-B1081-1 | 1 | 0 | Metal Stairs - General Notes Optional Use [temporarily withdrawn] | 04/18/12 | ||
ST-B1081-2 | 2 | 0 | Metal Stairs - Detail Optional Use [temporarily withdrawn] | 04/18/12 | ||
ST-B1081-3 | 3 | 0 | Metal Stairs - Details Optional Use [temporarily withdrawn] | 04/18/12 | ||
MOTOR CONTROL CENTER ANCHORAGE (INTERIOR) | ||||||
ST-D5020-3 | 1 | 1 | General Notes | 03/08/18 | ||
ST-D5020-3 | 2 | 1 | MCC to Housekeeping Pad Anchorage | 03/08/18 | ||
ST-D5020-3 | 3 | 1 | Housekeeping Pad to Existing Slab Anchorage | 03/08/18 | ||
NOTE: If the MCC is "unimportant (i.e., Ip = 1.0 per ASCE 7)" and being installed as part of a new- or existing-building project in which the seismic design of the building is based on SDC C, then the MCC is seismically exempt (per ASCE 7 para. 13.1.4) and compliance with the Std. Detail isn't required. | ||||||
WALL-MOUNTED EQUIPMENT | ||||||
ST-F1033-1 | 1 | 1 | Notes | 12/19/17 | ||
ST-F1033-2 | 2 | 1 | Approved Enclosure List | 12/19/17 | ||
ST-F1033-3 | 3 | 1 | Wall-Mounted Equipment Details Small | 12/19/17 | ||
ST-F1033-4 | 4 | 1 | Wall-Mounted Equipment Details Large | 12/19/17 | ||
Two Notes: (1) Hilti KB-TZ2 may be directly substituted for TZ in this detail. (2) In the event that SDC C applies and the enclosure(s) in question is "unimportant (i.e., Ip = 1.0 per ASCE 7)," then the enclosure(s) is seismically exempt (per ASCE 7 para. 13.1.4) and only gravity loads need be considered. | ||||||
Top of page |
Mechanical (Chapter 6)
POC:Michael Ladach ES-EPD, 667-1722 Alt: Todd Smith, ES-EPD, 665-3152 Suggestions (LANL ONLY; use IE)
Drawing Number | Sheet | Rev. | CAD | Title | Date | |
---|---|---|---|---|---|---|
EXAMPLE DRAWINGS | --- | |||||
M6010 | - | 0 | See Chapter 8 I&C Series D6000 Series | Process Flow Diagram Tower, DI, and Chilled Water | ||
M6020 | - | 0 | Process Flow Diagram HVAC | |||
M6030 | - | 0 | Piping & Instrumentation Diagram HVAC | |||
M6040 | - | 0 | Piping & Instrumentation Diagram Tower, DI, & Chilled Water | |||
M6041 | - | 0 | Piping & Instrumentation Diagram Tower, DI, & Chilled Water | |||
M6042 | - | 0 | Piping & Instrumentation Diagram Tower, DI, & Chilled Water | |||
P&ID LEGEND | --- | |||||
ST6999(M0001) | 1 | 1 | P&ID Legend | 09/30/04 | ||
ST6999(M0002) | 2 | 2 | P&ID Legend | 11/17/21 | ||
ST6999(M0003) | 3 | 1 | P&ID Legend | 09/30/04 | ||
NOISE/VIBRATION CONTROL | --- | |||||
ST-D10-30GEN-3 | 1 | 4 | Pipe/Electrical Conduit Penetration | 06/23/17 | ||
ST-D10-30GEN-3 | 2 | 4 | Duct Penetration | 06/23/17 | ||
ST-D10-30GEN-3 | 3 | 4 | Duct Penetration with Silencer, Preferred | 06/23/17 | ||
ST-D10-30GEN-3 | 4 | 4 | Duct Penetration with Silencer, Alternative | 06/23/17 | ||
BACKFLOW PREVENTER PIPING | --- | |||||
ST-D20GEN-1 | 1 | 4 | Screwed Ends | 06/23/17 | ||
ST-D20GEN-1 | 2 | 4 | Flanged Ends | 06/23/17 | ||
FREEZE PROTECTION | --- | |||||
ST-D20GEN-2 | 1 | 5 | Water Piping | 05/25/17 | ||
EMERGENCY SHOWER / EYE WASH | --- | |||||
ST-D2010-1 | 1 | 3 | Safety Shower with Drench Hose | 06/15/17 | ||
ST-D2010-1 | 2 | 4 | Safety Shower with Eyewash | 06/15/17 | ||
ST-D2010-1 | 3 | 4 | Eyewash | 06/15/17 | ||
ST-D2010-1 | 4 | 4 | Design Notes | 06/15/17 | ||
MISCELLANEOUS | --- | |||||
ST-D2020-1 | 1 | 2 | Site/Building Water Component Diagram | 06/23/17 | ||
WATER PRESSURE REDUCING VALVE (PRV) | --- | |||||
ST-D2020-2 | 1 | 4 | Building Service | 06/23/17 | ||
ST-D2020-2 | 2 | 4 | Miscellaneous Service | 06/23/17 | ||
COMPRESSOR AND AIR PIPING | --- | |||||
ST-D2090-1 | 1 | 4 | Lubricated Compressor, Tank Mounted | 06/15/17 | ||
ST-D2090-1 | 2 | 4 | Oil-Less/Oil Free Compressor, Tank Mounted | 06/15/17 | ||
ST-D2090-1 | 3 | 4 | Lubricated Compressor, Remote Receiver | 06/15/17 | ||
ST-D2090-1 | 4 | 4 | Oil-Less/Oil Free Compressor, Remote Receiver | 06/15/17 | ||
WATER TREATMENT SYSTEM | --- | |||||
ST-D30GEN-1 | 1 | 4 | Open Cooling Tower Water Treatment Flow Diagram | 06/29/18 | ||
ST-D30GEN-1 | 2 | 3 | Open Cooling Tower Water Treatment Notes Schedule | 06/29/17 | ||
WATER COIL PIPING | --- | |||||
ST-D30GEN-2 | 1 | 2 | Chilled Water, Variable Flow, Fail to No Cooling | 06/08/17 | ||
ST-D30GEN-2 | 2 | 2 | Chilled Water, Variable Flow, Fail to Full Cooling | 06/08/17 | ||
ST-D30GEN-2 | 4 | 2 | Hot Water, Variable Flow, Fail to No Heat | 06/08/17 | ||
ST-D30GEN-2 | 5 | 2 | Hot Water, Variable Flow, Fail to Full Heat | 06/08/17 | ||
ST-D30GEN-2 | 6 | 3 | Hydronic Preheat Coil Piping Detail Constant Flow, Fail to Full Heat | 04/08/19 | ||
ST-D30GEN-2 | 7 | 2 | Hot Water, On/Off Flow, Fan to Full Heat | 06/08/17 | ||
ST-D30GEN-2 | 8 | 2 | Hot Water, On/Off Flow, Fail to Full Heat | 06/08/17 | ||
ST-D30GEN-2 | 9 | 2 | Chilled/Hot Water, Stacked Coils | 06/08/17 | ||
STEAM COIL PIPING | --- | |||||
ST-D30GEN-3 | 1 | 2 | Variable Flow through Coil, Fail to Full Heat | 06/08/17 | ||
ST-D30GEN-3 | 2 | 2 | On/Off Flow through Preheat Coil | 06/08/17 | ||
ST-D30GEN-3 | 3 | 1 | Canceled 5/24/17 Pneumatic Control Diagram for Preheat Coil | 8/14/03 | ||
ST-D30GEN-3 | 4 | 1 | Canceled 6/8/17 Design Notes | 8/14/03 | ||
PUMP PIPING | --- | |||||
ST-D30GEN-4 | 1 | 3 | End Suction | 06/29/17 | ||
ST-D30GEN-4 | 2 | 3 | End Suction with Suction Diffuser | 06/29/17 | ||
ST-D30GEN-4 | 3 | 3 | Horizontal Split Case, Double Suction | 06/29/17 | ||
ST-D30GEN-4 | 4 | 3 | Vertical Split Case, Double Suction | 06/29/17 | ||
ST-D30GEN-4 | 5 | 3 | Vertical Split Case, Double Suction with Suction Diffuser | 06/29/17 | ||
ST-D30GEN-4 | 6 | 3 | In-Line | 06/29/17 | ||
ST-D30GEN-4 | 7 | 3 | Design Notes | 06/29/17 | ||
STEAM UNIT HEATER | --- | |||||
ST-D3020-1 | 1 | 2 | Steam Unit Heater Piping | 06/29/17 | ||
ST-D3020-1 | 2 | 2 | Design Notes and Controls | 06/29/17 | ||
STEAM PRESSURE REDUCING VALVE (PRV) STATION | --- | |||||
ST-D3020-2 | 1 | 4 | Steam (PRV) Station-Single Stage | 06/23/17 | ||
ST-D3020-2 | 2 | 4 | Steam (PRV) Station-Dual Stage | 06/23/17 | ||
ST-D3020-2 | 3 | 4 | Steam (PRV) Station-Parallel | 06/23/17 | ||
ST-D3020-2 | 4 | 3 | Design Notes | 06/23/17 | ||
STEAM DRIP LEG | --- | |||||
ST-D3020-3 | 1 | 2 | Along Piping Run | 06/23/17 | ||
ST-D3020-3 | 2 | 2 | End of Main | 06/23/17 | ||
STEAM DRIP PAN ELBOW | --- | |||||
ST-D3020-4 | 1 | 2 | 2" - 8" Size | 06/23/17 | ||
ST-D3020-4 | 2 | 2 | 1/2" - 1 1/2" Size | 06/23/17 | ||
COOLING TOWER & CHILLER | --- | |||||
ST-D3030-1 | 1 | 1 | Component Diagram | 6/15/17 | ||
INSTRUMENTATION | --- | |||||
ST-D3040-1 | 1 | 4 | Fume Hood Air Flow Indicator | 07/06/17 | ||
ST-D3040-5 | 1 | 4 | Air Filter Pressure Drop Gauge | 07/06/17 | ||
DUCTWORK/STACKS | --- | |||||
ST-D3040-2 | 1 | 4 | Return Air Sound Trap | 07/06/17 | ||
ST-D3040-3 | 1 | 3 | Stackhead | 07/06/17 | ||
ST-D3040-6 | 1 | 2 | HVAC Duct Security Bars Installation Detail | 07/06/17 | ||
ST-D3040-6 | 2 | 2 | HVAC Duct Security Bars SCIF | 07/06/17 | ||
FILTER TRAIN (Bag-Out Housing) | --- | |||||
ST6700 | 1 | 1 | Single Stage HEPA Filter | 05/11/17 | ||
ST6700 | 2 | 1 | Two Stage HEPA Filters | 05/11/17 | ||
ST6700 | 3 | 1 | Two Stage HEPA Filters with Chemical Absorbers | 05/11/17 | ||
ST6700 | 4 | 1 | Design Notes | 05/11/17 | ||
Top of page |
Electrical (Chapter 7)
POC: Eric Stromberg, ES-EPD, 665-6070 Alternate POC: Michael Richardson, ES-EPD, 667-0599 Suggestions (LANL ONLY; use IE)
Drawing Number | Sheet | Rev. | CAD | Title | Date | |
---|---|---|---|---|---|---|
EXAMPLE DRAWINGS | ||||||
D5000-1 | 1 | 3 | Legend and General Notes | 03/11/19 | ||
D5000-2 | 1 | 2 | One-line Diagram | 09/25/06 | ||
D5000-3 | 1 | 2 | Circuit Designations and Electrical Identification Diagram | 09/25/06 | ||
D5010-1 | 1 | 2 | Grounding System Diagram | 09/25/06 | ||
D5010-2 | 1 | 2 | Isolated Ground System Diagram | 09/25/06 | ||
D5010-3 | 1 | 0 | Meter Connection Diagram | 08/14/08 | ||
D5010-4 | 1 | 0 | Meter Installation Detail | 08/14/08 | ||
D5010-5 | 1 | 0 | Meter Connection Diagram | 08/14/08 | ||
D5020-1 | 1 | 2 | Motor Control Wiring Diagrams | 09/25/06 | ||
D5030-1 | 1 | 3 | Telephone-Data Equipment Closets and Riser Diagram | 08/14/08 | ||
D5030-2 | 1 | 2 | Fire Alarm Riser Diagram | 09/25/06 | ||
D5030-3 | 1 | 0 | Small Building Telecommunications Room Plan and Telecommunications Riser Diagram | 09/03/08 | ||
STANDARD DRAWINGS | ||||||
ST-D5020-2 | 1 | 0 | Haworth Furniture Wiring Diagram | 04/27/21 | ||
ST-D5020-2 | 2 | 0 | Herman Miller Furniture Wiring Diagram | 04/27/21 | ||
ST-D5020-3, Motor Control Center Anchorage (under Structural above) | ||||||
ST-G4010-01 | 1 | 0 | 115V Transmission Line-Tangent Structure 401 (0°) Detail | 09/30/02 | ||
ST-G4010-02 | 1 | 0 | 115V Transmission Line-Tangent Structure 402 (1° - 4°) Detail | 09/30/02 | ||
ST-G4010-02 | 2 | 0 | Tangent Structure 402 (1°-4°) - Bill of Materials | 09/30/02 | ||
ST-G4010-03 | 1 | 0 | 115KV Transmission Line - Tangent Structure 403 (4°-8°) Detail | 09/30/02 | ||
ST-G4010-03 | 2 | 0 | Tangent Structure 403 (4°-8°) - Bill of Materials | 09/30/02 | ||
ST-G4010-04 | 1 | 0 | 115KV Transmission Line - Tangent Structure 404 (9°-24°) Detail | 09/30/02 | ||
ST-G4010-04 | 2 | 0 | Tangent Structure 404 (9°-24°) - Bill of Materials | 09/30/02 | ||
ST-G4010-05 | 1 | 0 | 115KV Transmission Line - Tangent Structure 405 (25°-45°) Detail | 09/30/02 | ||
ST-G4010-05 | 2 | 0 | Tangent Structure 405 (25°-45°) - Bill of Materials | 09/30/02 | ||
ST-G4010-06 | 1 | 0 | 115KV Transmission Line - Tangent Structure 406 (45°-68°) Detail | 09/30/02 | ||
ST-G4010-06 | 2 | 0 | Tangent Structure 406 (45°-68°) - Bill of Materials | 09/30/02 | ||
ST-G4010-07 | 1 | 0 | 115KV Transmission Line - Tangent Structure 408 (Extra Long Span) Detail | 09/30/02 | ||
ST-G4010-08 | 1 | 0 | 115KV Transmission Line - Tangent Structure 409 Detail | 09/30/02 | ||
ST-G4010-08 | 2 | 0 | Tangent Structure 409 (Dead End) - Bill of Materials | 09/30/02 | ||
ST-G4010-09 | 1 | 0 | 115KV Transmission Line - Tangent Structure 410 (0°-1°) Detail | 09/30/02 | ||
ST-G4010-10 | 1 | 0 | Distribution - Single Arm Tangent Structure Detail | 09/30/02 | ||
ST-G4010-10 | 2 | 0 | Distribution - Single Arm Tangent Structure - Bill of Materials | 09/30/02 | ||
ST-G4010-11 | 1 | 0 | Distribution - 0°-15° Angle Structure Detail | 09/30/02 | ||
ST-G4010-11 | 2 | 0 | Distribution - 0°-15° Angle Structure - Bill of Materials | 09/30/02 | ||
ST-G4010-12 | 1 | 0 | Distribution - 16°-29° Angle Structure Detail | 09/30/02 | ||
ST-G4010-12 | 2 | 0 | Distribution - 16°-29° Angle Structure - Bill of Materials | 09/30/02 | ||
ST-G4010-13 | 1 | 0 | Distribution - 30°-59° Angle Structure Detail | 09/30/02 | ||
ST-G4010-13 | 2 | 0 | Distribution - 30°-59° Angle Structure - Bill of Materials | 09/30/02 | ||
ST-G4010-14 | 1 | 0 | Distribution - 60°-90° Angle Structure Detail | 09/30/02 | ||
ST-G4010-14 | 2 | 0 | Distribution - 60°-90° Angle Structure - Bill of Materials | 09/30/02 | ||
ST-G4010-15 | 1 | 0 | Distribution - 90° Corner Structure Detail | 09/30/02 | ||
ST-G4010-15 | 2 | 0 | Distribution - 90° Corner Structure - Bill of Materials | 09/30/02 | ||
ST-G4010-16 | 1 | 0 | Distribution - Double Deadend Structure Detail | 09/30/02 | ||
ST-G4010-16 | 2 | 0 | Distribution - Double Deadend Structure - Bill of Materials | 09/30/02 | ||
ST-G4010-17 | 1 | 0 | Distribution - Single Arm Tangent 3-Way Structure Detail | 09/30/02 | ||
ST-G4010-17 | 2 | 0 | Distribution - Single Arm Tangent 3-Way Structure - Bill of Materials | 09/30/02 | ||
ST-G4010-18 | 1 | 0 | Distribution - New 3-Way Tap on Existing Tangent Structure Detail | 09/30/02 | ||
ST-G4010-18 | 2 | 0 | Distribution - New 3-Way Tap on Existing Tangent Structure - Bill of Materials | 09/30/02 | ||
ST-G4010-19 | 1 | 0 | Distribution - CSP Transformer Installation Detail | 09/30/02 | ||
ST-G4010-20 | 1 | 0 | Distribution - New 3 Phase Transformer Bank on Existing Pole Detail | 09/30/02 | ||
ST-G4010-20 | 2 | 0 | Distribution - New 3 Phase Transformer Bank on Existing Pole - Bill of Materials | 09/30/02 | ||
ST-G4010-21 | 1 | 0 | New 3 Phase Transformer Bank on Existing Pole with Underground Secondary Detail | 09/30/02 | ||
ST-G4010-21 | 2 | 0 | New 3 Phase Transformer Bank on Existing Pole with Underground Secondary- Bill of Materials | 09/30/02 | ||
ST-G4010-22 | 1 | 0 | New 3 Phase Transformer Bank on Deadend Pole with Overhead Secondary Detail | 09/30/02 | ||
ST-G4010-23 | 1 | 0 | New 3 Phase Transformer Bank on Deadend Pole with Underground Secondary Detail | 09/30/02 | ||
ST-G4010-24 | 1 | 0 | Distribution- New Deadend Pole with Primary Riser Detail | 09/30/02 | ||
ST-G4010-25 | 1 | 0 | Distribution- Existing Pole with Primary Riser Detail | 09/30/02 | ||
ST-G4010-26 | 1 | 0 | Distribution- Standard Switch Installation with Remote Operator Detail | 09/30/02 | ||
ST-G4010-27 | 1 | 0 | Distribution- Standard Recloser and Sectionalizer Installation Detail | 09/30/02 | ||
ST-G4010-27 | 2 | 0 | Distribution- Standard Recloser and Sectionalizer Installation - Bill of Materials | 09/30/02 | ||
ST-G4010-28 | 1 | 0 | Distribution- Standard 2-Pole Gang Switch Installation Detail | 09/30/02 | ||
ST-G4010-28 | 2 | 0 | Distribution- Standard 2-Pole Gang Switch Installation - Bill of Materials | 09/30/02 | ||
ST-G4010-29 | 1 | 0 | Distribution- Standard 4-Pole Gang Switch Installation Detail | 09/30/02 | ||
ST-G4010-29 | 2 | 0 | Distribution- Standard 4-Pole Gang Switch Installation - Bill of Materials | 09/30/02 | ||
ST-G4010-30 | 1 | 0 | Distribution- Primary Metering Detail | 09/30/02 | ||
ST-G4010-30 | 2 | 0 | Distribution- Primary Metering - Bill of Materials | 09/30/02 | ||
ST-G4010-31 | 1 | 0 | Distribution- Pole Mounted Capacitor Installation Detail | 09/30/02 | ||
ST-G4010-32 | 1 | 0 | Underground Distribution - Electrical Ductbank Details | 09/30/02 | ||
ST-G4010-33 | 1 | 0 | Guy Details | 09/30/02 | ||
ST-G4010-34 | 1 | 0 | Underground Distribution - Type "A" Manhole | 09/30/02 | ||
ST-G4010-35 | 1 | 0 | Underground Distribution - Type "B" Manhole | 09/30/02 | ||
ST-G4010-36 | 1 | 0 | Underground Distribution - Type "C" Manhole | 09/30/02 | ||
ST-G4010-37 | 1 | 0 | Underground Distribution - Type "D" Manhole | 09/30/02 | ||
ST-G4010-37 | 2 | 0 | Underground Distribution - Type "D" Manhole Cover | 09/30/02 | ||
ST-G4010-38 | 1 | 3 | Square D Three Phase Transformer Anchorage and Concrete Slabs on Grade | 04/16/18 | ||
Two Notes: (1) Hilti KB-TZ2 may be directly substituted for TZ in this detail.(2) If the exterior, on-grade transformer is "unimportant (i.e., Ip = 1.0 per ASCE 7)" and being installed as part of a new- or existing-building project in which the seismic design of the building is based on SDC C, compliance with the slab/anchorage shown on Std. Detail (6" slab, ½" dia, 3.25" embedment) isn't required for seismic but is appropriate if project desires to ensure adequate resistance against worst-case wind load; alternatively, if only resistance against Risk-Category-II wind load is desired, use of lesser slab/anchorage (4" slab, 3/8"dia, 2" embedment) is adequate. See ESM Ch. 5 Section II (r11 para. 1.1.A) guidance regarding such installations | ||||||
ST-G4010-39 | 1 | 0 | Pad Mounted Equipment Protection and Barrier Pipe Details | 09/25/06 | ||
Top of page |
Instrumentation & Control (Chapter 8)
POC: Allen Hayward, ES-EPD, 606-0840 Alt: TBD Suggestions (LANL ONLY; use IE)
Drawing Number | Sheet | Rev. | CAD | Title | Date | |
---|---|---|---|---|---|---|
EXAMPLES | ||||||
D-6000 | 1 | 0 | HVAC Air Flow Diagram | 09/28/06 | ||
D-6005 | 1 | 0 | Technical Facility Process Flow Diagram | 09/28/06 | ||
D-6010 | 1 | 0 | Technical Facility HVAC Process & Instrumentation Diagram | 09/28/06 | ||
D-6015 | 1 | 0 | Office Building HVAC Process & Instrumentation Diagram | 09/28/06 | ||
D-6020 | 1 | 0 | Cooling Water Process Flow Diagram | 09/28/06 | ||
D-6025 | 1 | 0 | Cooling Water Process & Instrumentation Diagram | 09/28/06 | ||
D-6025 | 2 | 0 | Cooling Water Process & Instrumentation Diagram | 09/28/06 | ||
E-6050 | - | 0 | Machine X Schematic Diagram | 05/31/05 | ||
E-6055 | - | 0 | Panel Component Arrangement Diagram | 05/31/05 | ||
E-6060 | - | 0 | CP-1 Connection Diagram | 05/31/05 | ||
E-6061 | - | 0 | CP-1 Door Connection Diagram | 05/31/05 | ||
E-6065 | - | 0 | CP-1 to TBX-1 Interconnection Diagram | 05/31/05 | ||
E-6070 | - | 0 | Field Device Interconnection Diagram | 05/31/05 | ||
E-6075 | - | 0 | PLC-1 Input and Output Diagram | 05/31/05 | ||
P&ID LEGEND | ||||||
ST-6999 (M0001) | 1 | 1 | P&ID Legend | 09/30/04 | ||
ST-6999 (M0002) | 2 | 2 | P&ID Legend | 11/17/21 | ||
ST-6999 (M0003) | 3 | 1 | P&ID Legend | 09/30/04 | ||
Top of page |
Source: https://engstandards.lanl.gov/Dwgs_Details.shtml
0 Response to "Free Autocad Washer Connector Box Detail Drawings"
Post a Comment